The Los Angeles Business Assistance Virtual Network
     Home  |  Search Opportunities  |  FAQ  |  Register  |  Login  
 
  General     Job Related Meetings     Documents     Line Items     Subcontractors     Award Information  

EV00002110 - Rock, Sand and Gravel

Summary Status
Contract ID: 8691
Bid Method: Line Items
Category: Commodity
Type: Request For Quote
Check documents for detail.

Interest Codes:
212321 - Construction Sand and Gravel Mining
Status:Awarded
Posted:01/15/2010
Bid Due: 02/11/2010 10:00:00 AM PST
Contact
Dept:Department of General Services
Name:Martha M Medina
Phone:(213) 928-9556


Line # Unit Quantity Est. Cost Title
1 ton (US) o 600   Sand, Wash for Concrete (Excluding Ashpalt 1 & 2)....
2 ton (US) o 100   Sand, Washed, For Plaster/Gunite (Excluding Ashpalt 1 & 2)....
3 ton (US) o 25   Sand, For Asphalt Concrete,(Excluding Ashpalt 1 & 2)....
4 ton (US) o 400   Gravel, 3/8"- 1 1/2 Gradation, (Excluding Ashpalt 1 & 2)....
5 ton (US) o 1   Rock, Crushed, 1-1/2", (Excluding Ashpalt 1 & 2)....
6 ton (US) o 100   Rock, Crushed, 1", (Excluding Ashpalt 1 & 2)....
7 ton (US) o 600   Rock, Crushed, 3/4", (Excluding Ashpalt 1 & 2)....
8 ton (US) o 10   Rock, Crushed, 1/2", (Excluding Ashpalt 1 & 2)....
9 ton (US) o 100   Rock, Crushed, 3/8", (Excluding Ashpalt 1 & 2)....
10 ton (US) o 1   Rock, Dust,(Excluding Ashpalt 1 & 2)....
11 ton (US) o 75   Base, Aggregated, Crushed, (Excluding Ashpalt 1 & 2)....
12 ton (US) o 1   Base, Miscellanous, Crushed, (Excluding Ashpalt 1 &2)....
13 ton (US) o 1   Delivery to Region, San Fernando Valley-Districts 215-224...
14 ton (US) o 1   Delivery to Region, West Los Angeles, District 111-113 & 21...
15 ton (US) o 1   Delivery to Region, Wilmington/San Pedro-District 101...
16 ton (US) o 100   Sand, Fill Sand, Unwashed, SE 30, Pick up...
17 ton (US) o 1   Sand, Washed for Concrete, Pick up...
18 ton (US) o 1   Sand, Washed for Asphalt Concrete, Pick up...
19 ton (US) o 1   Sand, Washed for Plaster/Gunite, Pick up...
20 ton (US) o 1   Concrete Aggregate, #2 rock, Pick up...
21 ton (US) o 1   Concrete Aggregate, #3 rock, Pick up...
22 ton (US) o 1   Concrete Aggregate, #4 rock, Pick up...
23 ton (US) o 1   Concrete Aggregate, 1" rock, Pick up...
24 ton (US) o 1   Concrete Aggregate, 3/4" rock, Pick up...
25 ton (US) o 1   Concrete Concrete Aggregate, 1/2" rock, Pick up...
26 ton (US) o 1   Concrete Aggregate, 3/8" rock, Pick up...
27 ton (US) o 1   Rock, Dust, Pick up...
28 ton (US) o 1   Base, Aggregated, Crushed, Pick up...
29 ton (US) o 1   Base, Miscellanous, Crushed, Pick up...
30 ton (US) o 1   Charge, Minimum Load...
31 each 1   Environmental Fee, Per Load...
32 hour 1   Standing Time...
33 hour 1   Haul Charge, Premium time, 12:01 am to 4: 00 am...
34 ton (US) o 1   Delivery Charge, Saturday...
35 ton (US) o 1   Delivery Charge, Sunday...
36 ton (US) o 1   Delivery Charge, Holiday...
37 hour 1   Plant opening, Saturday...
38 hour 1   Plant opening, Sunday...
39 hour 1   Plant opening, Holiday...
40 ton (US) o 1   Sand, Washed Concrete Sand, delivered for Asphalt Plant 2....
41 ton (US) o 1   Sand, Washed, Plaster/Gunite delivered for, Asphalt Plant 2...
42 ton (US) o 80,000   Sand, Asphalt Concrete Sand (BIT), delivered for Asphalt Pla...
43 ton (US) o 1   Gravel, 3/8"- 1 1/2 Gradation, delivered for Ashpalt Plant 2...
44 ton (US) o 1   Rock, Crushed, 1-1/2", delivered for Ashpalt Plant Plant 2....
45 ton (US) o 1   Rock, Crushed, 1", for Ashpalt Plant 2....
46 ton (US) o 3,500   Rock, Crushed, 3/4", for Ashpalt Plant 2....
47 ton (US) o 41,000   Rock, Crushed, 1/2", for Ashpalt Plant 2....
48 ton (US) o 52,000   Rock, Crushed, 3/8", for Ashpalt Plant 2....
49 ton (US) o 1   Rock, Dust, for Ashpalt Plant 2....
50 ton (US) o 1   Base, Aggregated, Crushed, for Ashpalt 2....
51 ton (US) o 1   Base, Miscellanous Crushed, for Ashpalt 2....


You must be logged in to download listed documents
Instructions for downloading documents :
1. You must be logged in to download the documents.
2. Enable pop-ups.
3. Left click the document title/name to download the document OR right click the document title/name and select Save target as/Open link in new window/tab.
Scope of Work Documents Standard Requirements Documents
  • Addendum-1.pdf(41Kb)
  • Addendum-2.pdf(43Kb)
  • RFP detail(65Kb)
  • AAFORMWORD.pdf   (2182Kb)
  • ATTACHMENT_A.pdf   (43Kb)
  • CRO Completion Instructions.pdf   (18Kb)
  • CRO_PLEDGE_OF_COMPLIANCE_1.pdf   (37Kb)
  • CRO_QUESTIONNAIRE_(PROCUREMENT).pdf   (242Kb)
  • City Maintenance Yards _ Engineering Dist.Map.pdf   (653Kb)
  • EBO_COMPLIANCE_FORM.pdf   (184Kb)
  • MUNICIPAL_LOBBYING_ORDINANCE_VER_2.pdf   (537Kb)
  • MUNICIPAL_LOBBYING_ORDINANCE_VER_21.pdf   (537Kb)
  • RFQ_CHECK_LIST-MAILING_.doc   (27Kb)
  • RFQ_SIGNATURE_PAGE.pdf   (228Kb)
  • SDO_BIDDER_AFFIDAVIT.pdf   (40Kb)
  • SWEAT FREE PO_CODE_OF_CONDUCT.doc   (24Kb)


Meetings Location Description
No Meetings Scheduled