| Summary |
Status |
| Contract ID: |
8691 |
| Bid Method: |
Line Items |
| Category: |
Commodity
|
| Type: |
Request For Quote
|
|
Check documents for detail.
|
Interest Codes:
212321 - Construction Sand and Gravel Mining
|
|
| Status: | Awarded |
| Posted: | 01/15/2010 |
| Bid Due: |
02/11/2010 10:00:00 AM PST
|
|
| Contact |
| Dept: | Department of General Services |
| Name: | Martha M Medina |
| Phone: | (213) 928-9556 |
|
| Line #
| Unit
| Quantity
| Est. Cost
| Title
|
| 1 |
ton (US) o |
600 |
|
Sand, Wash for Concrete (Excluding Ashpalt 1 & 2).... |
| 2 |
ton (US) o |
100 |
|
Sand, Washed, For Plaster/Gunite (Excluding Ashpalt 1 & 2).... |
| 3 |
ton (US) o |
25 |
|
Sand, For Asphalt Concrete,(Excluding Ashpalt 1 & 2).... |
| 4 |
ton (US) o |
400 |
|
Gravel, 3/8"- 1 1/2 Gradation, (Excluding Ashpalt 1 & 2).... |
| 5 |
ton (US) o |
1 |
|
Rock, Crushed, 1-1/2", (Excluding Ashpalt 1 & 2).... |
| 6 |
ton (US) o |
100 |
|
Rock, Crushed, 1", (Excluding Ashpalt 1 & 2).... |
| 7 |
ton (US) o |
600 |
|
Rock, Crushed, 3/4", (Excluding Ashpalt 1 & 2).... |
| 8 |
ton (US) o |
10 |
|
Rock, Crushed, 1/2", (Excluding Ashpalt 1 & 2).... |
| 9 |
ton (US) o |
100 |
|
Rock, Crushed, 3/8", (Excluding Ashpalt 1 & 2).... |
| 10 |
ton (US) o |
1 |
|
Rock, Dust,(Excluding Ashpalt 1 & 2).... |
| 11 |
ton (US) o |
75 |
|
Base, Aggregated, Crushed, (Excluding Ashpalt 1 & 2).... |
| 12 |
ton (US) o |
1 |
|
Base, Miscellanous, Crushed, (Excluding Ashpalt 1 &2).... |
| 13 |
ton (US) o |
1 |
|
Delivery to Region, San Fernando Valley-Districts 215-224... |
| 14 |
ton (US) o |
1 |
|
Delivery to Region, West Los Angeles, District 111-113 & 21... |
| 15 |
ton (US) o |
1 |
|
Delivery
to Region, Wilmington/San Pedro-District 101... |
| 16 |
ton (US) o |
100 |
|
Sand, Fill Sand, Unwashed, SE 30, Pick up... |
| 17 |
ton (US) o |
1 |
|
Sand, Washed for Concrete, Pick up... |
| 18 |
ton (US) o |
1 |
|
Sand, Washed for Asphalt Concrete, Pick up... |
| 19 |
ton (US) o |
1 |
|
Sand, Washed for Plaster/Gunite, Pick up... |
| 20 |
ton (US) o |
1 |
|
Concrete Aggregate, #2 rock, Pick up... |
| 21 |
ton (US) o |
1 |
|
Concrete Aggregate, #3 rock, Pick up... |
| 22 |
ton (US) o |
1 |
|
Concrete Aggregate, #4 rock, Pick up... |
| 23 |
ton (US) o |
1 |
|
Concrete Aggregate, 1" rock, Pick up... |
| 24 |
ton (US) o |
1 |
|
Concrete Aggregate, 3/4" rock, Pick up... |
| 25 |
ton (US) o |
1 |
|
Concrete Concrete Aggregate, 1/2" rock, Pick up... |
| 26 |
ton (US) o |
1 |
|
Concrete Aggregate, 3/8" rock, Pick up... |
| 27 |
ton (US) o |
1 |
|
Rock, Dust, Pick up... |
| 28 |
ton (US) o |
1 |
|
Base, Aggregated, Crushed, Pick up... |
| 29 |
ton (US) o |
1 |
|
Base, Miscellanous, Crushed, Pick up... |
| 30 |
ton (US) o |
1 |
|
Charge, Minimum Load... |
| 31 |
each |
1 |
|
Environmental Fee, Per Load... |
| 32 |
hour |
1 |
|
Standing Time... |
| 33 |
hour |
1 |
|
Haul Charge, Premium time, 12:01 am to 4: 00 am... |
| 34 |
ton (US) o |
1 |
|
Delivery Charge, Saturday... |
| 35 |
ton (US) o |
1 |
|
Delivery Charge, Sunday... |
| 36 |
ton (US) o |
1 |
|
Delivery Charge, Holiday... |
| 37 |
hour |
1 |
|
Plant opening, Saturday... |
| 38 |
hour |
1 |
|
Plant opening, Sunday... |
| 39 |
hour |
1 |
|
Plant opening, Holiday... |
| 40 |
ton (US) o |
1 |
|
Sand, Washed Concrete Sand, delivered for Asphalt Plant 2.... |
| 41 |
ton (US) o |
1 |
|
Sand, Washed, Plaster/Gunite delivered for, Asphalt Plant 2... |
| 42 |
ton (US) o |
80,000 |
|
Sand, Asphalt Concrete Sand (BIT), delivered for Asphalt Pla... |
| 43 |
ton (US) o |
1 |
|
Gravel, 3/8"- 1 1/2 Gradation, delivered for Ashpalt Plant 2... |
| 44 |
ton (US) o |
1 |
|
Rock, Crushed, 1-1/2", delivered for Ashpalt Plant Plant 2.... |
| 45 |
ton (US) o |
1 |
|
Rock, Crushed, 1", for Ashpalt Plant 2.... |
| 46 |
ton (US) o |
3,500 |
|
Rock, Crushed, 3/4", for Ashpalt Plant 2.... |
| 47 |
ton (US) o |
41,000 |
|
Rock, Crushed, 1/2", for Ashpalt Plant 2.... |
| 48 |
ton (US) o |
52,000 |
|
Rock, Crushed, 3/8", for Ashpalt Plant 2.... |
| 49 |
ton (US) o |
1 |
|
Rock, Dust, for Ashpalt Plant 2.... |
| 50 |
ton (US) o |
1 |
|
Base, Aggregated, Crushed, for Ashpalt 2.... |
| 51 |
ton (US) o |
1 |
|
Base, Miscellanous Crushed, for Ashpalt 2.... |
You must be logged in to download listed documents
|
Instructions for downloading documents :
1. You must be logged in to download the documents.
2. Enable pop-ups.
3. Left click the document title/name to download the document
OR right click the document title/name and select Save target as/Open link in new window/tab.
|
| Scope of Work Documents |
Standard Requirements Documents |
-
Addendum-1.pdf(41Kb)
-
Addendum-2.pdf(43Kb)
-
RFP detail(65Kb)
|
-
AAFORMWORD.pdf
(2182Kb)
-
ATTACHMENT_A.pdf
(43Kb)
-
CRO Completion Instructions.pdf
(18Kb)
-
CRO_PLEDGE_OF_COMPLIANCE_1.pdf
(37Kb)
-
CRO_QUESTIONNAIRE_(PROCUREMENT).pdf
(242Kb)
-
City Maintenance Yards _ Engineering Dist.Map.pdf
(653Kb)
-
EBO_COMPLIANCE_FORM.pdf
(184Kb)
-
MUNICIPAL_LOBBYING_ORDINANCE_VER_2.pdf
(537Kb)
-
MUNICIPAL_LOBBYING_ORDINANCE_VER_21.pdf
(537Kb)
-
RFQ_CHECK_LIST-MAILING_.doc
(27Kb)
-
RFQ_SIGNATURE_PAGE.pdf
(228Kb)
-
SDO_BIDDER_AFFIDAVIT.pdf
(40Kb)
-
SWEAT FREE PO_CODE_OF_CONDUCT.doc
(24Kb)
|
| Meetings |
Location |
Description |
| No Meetings Scheduled |
|