SZD11344, SZD11134, SZD11324, SZD11329 - Donald C Tillman Water Reclamation Plant- AWPF Primary Equalization Basin, Emergency Backup Power, AVORS & EVIS Gates, Screw Pumps Inlet Gates


General Information
BAVN ID: 38871
Category: Construction
Type: Request For Bid
Budget: $64,852,000.00
Description: Only the following prequalified design-build contractors can bid as primes for this project:
  1. W. M. Lyles Company
  2. Kiewit Corporation
  3. Walsh Group
At DCTWRP: Design, demo / remediate* / remove / modify old, procure (some elements sole-sourced) / provide / install new equpment for, construct, integrate with facility & commision 4 projects involving industrial-scale equipment and facilities for high-volume processing of waste
*Lead-based paint and asbestos
See bid package for full scope & details
Bid package only on BAVN- download Part 1 to be a planholder
For Planholders Lists & Bid Results, click here
Prime NAICS: 237990: Other Heavy and Civil Engineering Construction
238210: Electrical Contractors
Sub NAICS: 237110: Water and Sewer Line and Related Structures Construction
238110: Poured Concrete Foundation and Structure Contractors
238120: Structural Steel and Precast Concrete Contractors
238190: Other Foundation, Structure, and Building Exterior Contractors
238220: Plumbing, Heating, and Air-Conditioning Contractors
238290: Other Building Equipment Contractors
238320: Painting and Wall Covering Contractors
238390: Other Building Finishing Contractors
238910: Site Preparation Contractors
238990: All Other Specialty Trade Contractors
324121: Asphalt Paving Mixture and Block Manufacturing
326122: Plastics Pipe and Pipe Fitting Manufacturing
326199: All Other Plastics Product Manufacturing
327320: Ready-Mix Concrete Manufacturing
327390: Other Concrete Product Manufacturing
332312: Fabricated Structural Metal Manufacturing
332321: Metal Window and Door Manufacturing
332322: Sheet Metal Work Manufacturing
332323: Ornamental and Architectural Metal Work Manufacturing
332618: Other Fabricated Wire Product Manufacturing
332911: Industrial Valve Manufacturing
332996: Fabricated Pipe and Pipe Fitting Manufacturing
333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
333999: All Other Miscellaneous General Purpose Machinery Manufacturing
334290: Other Communications Equipment Manufacturing
334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
335311: Power, Distribution, and Specialty Transformer Manufacturing
335312: Motor and Generator Manufacturing
335313: Switchgear and Switchboard Apparatus Manufacturing
335931: Current-Carrying Wiring Device Manufacturing
335932: Noncurrent-Carrying Wiring Device Manufacturing
335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
541330: Engineering Services
541380: Testing Laboratories
561730: Landscaping Services
562910: Remediation Services

* The current status is 'Amended'. The City has made a change to the contracting opportunity for which it is currently accepting bids/proposals.
** There is an online Business Inclusion Outreach requirement. All outreach must be completed by 02/25/20 at 11:59 PM. No outreach will be allowed or considered on or after 02/26/20 12:00 AM.

Status
Status: Amended *
Posted: 01/17/20
Outreach Due: 02/26/20 12:00 AM**
Bid Due: 03/11/20 10:00 AM
Summary Due: 03/12/20 4:30 PM

Contact
Dept: Engineering Bureau, Public Works
Name: Plan Distribution
Email: eng.plandist@lacity.org
Phone: 213-847-0100

Amendments

Date Title
02/07/20 Addendum 3 (***PLA Added to Project***)
Adds the Department of Public Works Project Labor Agreement and Infrastructure Stabilization Policy to Part IV of the bid proposal and changes the Table of Contents accordingly

01/30/20 Addendum 2
  • Changes the deadline for receipt of written technical questions in the bid proposal from February 12, 2020 to February 19, 2020
  • Answers a question from a supplier

01/27/20 Addendum 1 (***Job Walks Added for 9 AM February 6 & 9 AM February 12***)
Adds a 2nd Job Walk on February 6, 2020 (9 am at DCTWRP) & a 3rd Job Walk on February 12, 2020 (9 am at DCTWRP). Also provides the attendance sign-in sheets for the January 23, 2020 pre-bid meeting & job walk


Meetings

Date Location
01/23/20
at 10:00 AM
1st Floor Conference Room 150
1149 S Broadway
Los Angeles, CA 90015

Pre-Bid Meeting. Bidders not complying with bid proposal Part 3, Indicator 2 may be deemed nonresponsive
Attendance sign-in sheets will be included in a future addendum/notice

01/23/20
at 1:00 PM
DCTWRP*
6100 Woodley Ave
Van Nuys / Lake Balboa, CA 91406

Job Walk
Attendance sign-in sheets will be included in a future addendum/notice
* Thomas Guide 531-F7

02/06/20
at 9:00 AM
DCTWRP*
6100 Woodley Ave
Van Nuys / Lake Balboa, CA 91406

Job Walk
* Thomas Guide 531-F7

02/12/20
at 9:00 AM
DCTWRP*
6100 Woodley Ave
Van Nuys / Lake Balboa, CA 91406

Job Walk
* Thomas Guide 531-F7


Documents

Please login to download listed documents for this opportunity.
Scope of Work Documents Uploaded Size
SZD11344_Info.pdf 01/16/20 12:23 PM 31.0 KB
Additional Documents Uploaded Size
SZD11344_Addendum 3.pdf 02/07/20 11:15 AM 3.25 MB
SZD11344_Addendum_1.pdf 01/27/20 3:37 PM 1.06 MB
SZD11344_Addendum_2.pdf 01/30/20 11:36 AM 477.0 KB
SZD11344_Bid_Pkg_Part_1.zip 01/16/20 12:24 PM 46.00 MB
SZD11344_Bid_Pkg_Part_2.zip 01/16/20 12:24 PM 77.50 MB
SZD11344_Bid_Pkg_Part_3.zip 01/16/20 12:25 PM 50.45 MB
SZD11344_Bid_Pkg_Part_4.zip 01/16/20 12:25 PM 41.36 MB
SZD11344_Bid_Pkg_Part_5.zip 01/16/20 12:28 PM 57.40 MB
SZD11344_Bid_Pkg_Part_6.zip 01/16/20 12:28 PM 68.77 MB
Business Inclusion Program (BIP)
Download the BAVN BIP Walkthrough manual